cheapbag214s
Joined: 27 Jun 2013
Posts: 16004
Read: 0 topics
Warns: 0/5 Location: England
|
Posted: Sun 3:53, 21 Jul 2013 Post subject: unfortunately |
|
|
far, an electrician and two pipe fitters. The Connecticut power plant where the February 7th explosion occurred was 95 percent completed, and set to start up this spring. The purging of the natural gas line in Middletown was likely performed incorrectly. Urgent recommendations issued by the U.S. Chemical Safety and Hazard Investigation Board just three days prior to the Middletown blast read: Purged fuel gases shall be directly vented to a safe location outdoors, away from personnel, and ignition sources. If outdoor venting is impossible, the recommendations required evacuating nonessential personnel and controlling or eliminating potential ignition sources. The proposed regulation also called for use of gas level monitors, which were in use on the Connecticut job. It was discovered, unfortunately, that routine safety procedures in other particulars weren�t being followed at the Kleen site; for instance,[link widoczny dla zalogowanych], live electricity was running through the site, workers were welding,[link widoczny dla zalogowanych], and a gas fuel torch heater was running
The post has been approved 0 times
|
|